01 — System Overview

What is the WTEC 4S™ System?

A self-supporting DC cable management and disconnect solution designed for utility-scale solar. It integrates cable support, routing, and prefabricated components into one system.

The 4S™ System organizes, supports, and protects DC cables across the site. It combines messenger wire, cable management blocks, pre-terminated trunk cables, and disconnect boxes into a single integrated solution.

  • Pre-terminated self-supporting DC trunk cable — 500, 600, or 750 KCMIL
  • Gen 2 snap-fit CMB blocks for organized homerun grouping
  • Bracketed messenger wire with East-West and North-South routing
  • Prefabricated disconnect boxes — 1500 Vdc, NEMA 4X, up to 600A
  • All cables UL 4703 PV 2KV rated and UV-resistant throughout
  • Code-compliant layouts per NEC 250 and NEC 690
Why 4S™
  • Faster installation with fewer field steps and prefabricated components
  • 🔒 Reduced cable stress and long-term failures through controlled sag and routing
  • Cleaner, safer, code-compliant layouts that pass inspection faster

02 — Installation Guides

Field Manuals

These documents cover all phases of 4S™ installation from structural support through final electrical connections. Download any manual directly as a PDF.

📋
W4S-MAN-601 · Full Installation Manual

4S™ Full Installation Manual

Complete end-to-end installation guide covering support system, bracket installation, trunk cable routing, grounding, and electrical connections. The master reference for all 4S™ field work.

🔴
W4S-MAN-101 · Rev 4 · 1/23/2026

Trunk Installation Manual

Dedicated guide for installing 4S™ Self-Supporting DC Trunk cables. Covers block installation, dead end assembly, cable sag & angle tables (15–30 ft spans), tension guidance at 80 lbs/cable, and electrical connections.

🔩
W4S-MAN-304 · Rev 03

Wire Management with Gen 2 CMB

Step-by-step guide for installing the Gen 2 Cable Management Block system, including messenger wire tensioning (40 lbf), block stacking for 2-pair and 4-pair homerun configurations, and mid-span support every 2 ft.

W4S-MAN-401 · Rev 5 · 3/10/2026

Disconnect Box Installation Manual

Full installation, wiring, and grounding instructions for WTEC DB-150xx series Disconnect Boxes. Covers I-beam mounting, DC feeder connections (340 in-lbs), and NEC 250 / 690 compliance.

📄
W4S-MAN-XXX

Additional Manual

More installation manuals will be added here as they become available.

03 — Technical Support

Need Help?

Contact our engineering team for troubleshooting, warranty questions, or site-specific guidance.

Victor Mikheev

Electrical Engineer

Ryan Deputy

Manufacturing Engineer

Chris House

Manufacturing Engineer

General Support

WTEC Website
www.wtecenergy.com 777 Terrace Avenue, Suite 101, Hasbrouck Heights, NJ 07604